{"id":226,"date":"2025-03-27T18:23:41","date_gmt":"2025-03-27T12:53:41","guid":{"rendered":"https:\/\/rigmen.com\/blog\/?p=226"},"modified":"2025-03-27T18:23:43","modified_gmt":"2025-03-27T12:53:43","slug":"importance-of-choke-drill-and-its-procedure","status":"publish","type":"post","link":"https:\/\/rigmen.com\/blog\/drilling\/importance-of-choke-drill-and-its-procedure\/","title":{"rendered":"Importance of Choke Drill and Its Procedure"},"content":{"rendered":"\n<p><strong>Choke drill<\/strong>&nbsp;is one of well control drills that will improve crew competency in driller\u2019s method. The advantages from the choke drill are as follows:<\/p>\n\n\n\n<p>\u2022 Get more familiar to practice controlling the pressure via a choke on the rig.<\/p>\n\n\n\n<p>\u2022 Get more understanding about lag time.<\/p>\n\n\n\n<p>\u2022 Practice the procedure to obtain the shut-in drill pipe pressure.<\/p>\n\n\n\n<p>\u2022 Ensure the surface well control equipment as pressure gauges, choke, BOP is ready for work.<\/p>\n\n\n\n<p>\u2022 Get more practices when attempting to bring the pump up to kill speed, slow the pump down and change the pump rate.<\/p>\n\n\n\n<p><strong>Choke Drill Steps are listed below:<\/strong><\/p>\n\n\n\n<p>1. Trip in hole above top of cement.<\/p>\n\n\n\n<p>2. Fill the pipe and circulate seawater or mud around for few minutes.<\/p>\n\n\n\n<p>3. Close annular preventer or upper rams preventer.<\/p>\n\n\n\n<p>4. Pressure up annulus to 200 psi (the pressure may be different depending on the company policy.)<\/p>\n\n\n\n<p>5. Line up the pump.<\/p>\n\n\n\n<p>6. Pump slowly to bump the float and obtain shut in drill pipe pressure.<\/p>\n\n\n\n<p>7. Bring the pump to kill rate by holding casing pressure constant \u2013 personnel need to adjust the choke.<\/p>\n\n\n\n<p>8. Measure lag time for the drill pipe gage after the adjustment of choke is made.<\/p>\n\n\n\n<p>9. Change circulation rate by holding casing pressure constant. Crew needs to adjust choke to achieve this.<\/p>\n\n\n\n<p>10. Shut the pump down by holding casing pressure constant.<\/p>\n\n\n\n<p>11. Bleed off pressure and line up for drilling operation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Choke drill&nbsp;is one of well control drills that will improve crew competency in driller\u2019s method. The advantages from the choke drill are as follows: \u2022&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[59,112,119],"tags":[118],"class_list":["post-226","post","type-post","status-publish","format-standard","hentry","category-drilling","category-operation","category-well-control","tag-choke-drill"],"_links":{"self":[{"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/posts\/226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/comments?post=226"}],"version-history":[{"count":1,"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/posts\/226\/revisions"}],"predecessor-version":[{"id":227,"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/posts\/226\/revisions\/227"}],"wp:attachment":[{"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/media?parent=226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/categories?post=226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rigmen.com\/blog\/wp-json\/wp\/v2\/tags?post=226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}